116 THE KANSAS CITY BRIDGE. Carried forward. ... 0... ccc cece ccc cc cee cece ee eee eee rece eeeeeees OUTFIT. Cost Steamer Gypsey..... 2... 2... cee cece cece tees $12,933 69 Less proceed of sales....... 2... eee cece eee ee eee 4,000 00 ——_———__ $8,933 69 Cost of barges and boats..... ‘sis Rath se di Eee a eee iene =o $13,949 67 Less transferred to pontoons............ce cee cere 6,000 00 $7,949 67 Tools, machinery, and equipment.................-. $54,881 86 Less proceed of sales......... 00... cece eee rece eens 9,073 53 — $45,808 33 Use of buildings, shanties, etc... ........... 0.2 e ee 2,453 22 MISCELLANEOUS EXPENSES. HEMQUMCCTING... 2. cece cee eet e ses essdsegaseastsregsewe seer $23,269 00 Soundings and borings in the river....... ised ole toh wa eitders odes 3,228 T1 Superintendence and inspection.............c cece eee cece eee eee 14,855 10 Office expemses................. Gh » mi bin oii agi o"hele. wine in, w So 2 = 0 1,866 87 Incidental expenses........ 0. ccc cc cece cece cee tee cee eeuees 3,880 25 Boating, ferriage, and cutting ice........... 2. cece cee ee eens 53,039 35 Contingencies (being cost of works of first caisson for Pier No. 4, up to the time of its wreck). 2.0.0... cc. eee cece eee 12,339 01 SUPERSTRUCTURE. Iron Span, No. 1, 71 feet.... 2... ..2. 200. ccssceeseweccces $5,335 98 Wood and Iron, No. 2,183 “ Jol... ccc cece ccc cece neces 9,183 38 Iron Draw, No. 3,360 “ ............ eee eee err errr 78,054 50 Wood and Iron, No. 4,200 “ co... eee cee ccc cece eee eeeues 18,639 14 - No. 5, 250 Lo. ccc ccc ccc cece ees 27,316 42 as No. 6,200 “ Lee cece cece cece cece cence 18,639 14 “e a CO FO A 15,126 70 Nicholson pavement, sidewalks, and hand-railing................. 28,730 96 Covering chords and painting bridge........... 0.0.00. cee ee eee 7,918 47 Toll-houses, telegraph lines, etc........... ccc ce cece cece cece eees 2,503 91 False-works for raising superstructure,..............00cc cece eens 21,142 87 Street rail track on bridge... 2.2.2... cece cee cee cece ees 3,494 22 Total cost of bridge proper............. 0c cece eee eee eeee APPROACHES AND RIVER PROTECTION. Southern Approach (Kansas City side)...... 00.0.0... cece eee ee $63,340 09 Northern Approach (including trestle) .............ccceecccecece 51,723 22 Dat proms... cols Petco e eee iio tases behcae cbse OAL, 1,003 68 “Protection of fiver Bank. ... 20.0... cece eee e ee Giwe sha dalee ws 90,938 81 $472,466 89 $65,144 91 $112,474 29 $236,085 69 $886,171 78 $207,005 80 Total expenditure..... 2.0.0.0 0c cece cccccccceceuceuccess $1,093,177 58