, The shower bath in the men's S intramural office needs painting badlys ‘The rust has taken the floor and part of the side of the steel far as we are concerned the water could be shut off so a | veno We find that paint does away with | Oe ee ee oe other single things Therefore we. , oor in the gymnasium @ hygenic measures Room 2023, @ small laboratory, has never been painted and I necessarye Any work that is hints Geveenaniea’, responsibility we will be glad to pay fore ZI am going ‘to: the University of Teams to be there witi? tm | back in Topelm after thate A letter addressed to me will receive immediate attentions I remanbor that work would have to be done this winter and perhaps will a apply to the painting of our offices i presume that the varsity ech ige sarc gar ine je gab glint Dine iho ela ata Se ee re ee ee ee 5 EF ei 5 £ e ah f g att Ee, 8 geod ae Se Be “Yours sincerely, . Direster of Physical Education and Recreation Varsity — Coach