Sept. 7, 1945 Mr. Leonard Axe, Director University Services Frank Strong Hall Dear Mr. Axe: Bids for the construction of Tennis Courta on The University Cam~- pus per plans and specifications by The State Architect are as follows: Bidder Base Bid Alt Ho 2 Alt No 2 Time Days 3.L.Constant $6325.00 # $3250.00 $6500.00 90 B.A.Green 6379.65 # $146.30 6356.65 90 (Alt 3) ~ 735.00 - $00.00 + 700.00 fhe low bidder M. NH. Penny offers the further deduction of $755.00 from the base bid and on alternates as listed above for omitting the drains specified around the Courts. These drains should be al eng w@nesideration by the Committee before accepting the a eB. The architects estimate was $5,000.00 but evidently did not in- clude some items which the bidders considered so that the bids are close enough to the estimate for approval. Mr. Kincaid requests that you call on him to convince hin of the necessity of construction at this time and at these costs. He will issue contracts if you so request. | Very truly yours, C.6. be fles, Supt. | Dept. ig. & Grounds CGB pr ec to Dr. Forrest C. Allen