hb Estimate of Cost of Construction of Reinforced Concrete Tennis Court by the Department of Physical Education | University of Kansas Reinforced Concrete Court, 120 ft. long, 56ft. wide and 5 inches thick, reinforced with wire meshe Concrete 56* = 120° = 5" «6 + 0 6 © e088 3 105 CUle (yds Cement, 6 sax x 105 cey. : (160, Bbls. at $2.50 scicavve § 360590 Satie GO Gig Vos wtccsesceeseeevces, BU 1600 auenseecn 60,00 Crushed Rock, 100 cue yase he tepewn OS 2aVO Ncteawene 200,00 Wire Mesh Reinforeing 760 sqe ydse at 0620 eeseseeee 152,00 Expansion Joint Material, 430 lin. fteat OeOGsercecees 25480 Coloring for top surface cescccccccccccccvecvvseseccese 25,00 Two removable not PostS secccerecccvccccrcscccssscscece 25200 Tile Drain, $50 Lins fts 45. Oy 04 deeb eedbeecacciseues 16.20 Crushed rock for draing 40 Ceye ceoeeeedt 2000 eoreceeee 80,00 Form Lumber, 360 Lin. ft., 2" x 6" = 360 F.M at 0,07.. 25.20 Total material csaccccccacees $976.20 Labor Grading eekiants not a great deal required esssseseses $50.00 Excavation for Drain Tile 40 ceys at Sle50eccecccesees 60.00 Placing Drain Tile and filling ditch with crushed rock 25.00 Lay and finish concrete p6 as diab aed id ibdeekas Waedsendsue 500,00 Painting marking Lines csseccccccccccccvccccceseccccese 25.00 ENGineering eesserccvecesccsscscccvscsccsssvassecessses 50.00 ‘Total Labor S@eeeeeeeseseseeenve $710.00 Grand Total. Labor & Material eecscecseccoveses $1686.00