REPAIRS AND IMPROVEMENTS Requested For 1930-31 1936~37 1937-38 1938-39 Appropriation $5,000 2 »500 1,500 7 »500 The reduction of this appropriation for six years has resulted in an accumulation of improvement needs. In addition, the four new units started during the past year have placed added demands on the appropriation. The following urgent needs would be met by the amount requested: 1. Repairs to Parapet Walls ---------+---- $2,500 Parapet walls around the Administration Building, the Nurses Home and the Ward Building show some leak- age. In the Nurses Home considerable damage already has occurred from seepage. 2. Addition to Water Softener - - - - - - - - - - - ~ - $3,000 Expansion of the hospital plant and increased de- mands of the laundry make the present water softener facilities inadequate. 3. Feedwater Pump for Power Plant ----------- $400 The one present pump is inadequate to handle the strain. 4, Garage Doors - - - - - ee $500 Due to lack of funds the new warehouse garage was left without doors. 5. Transformer Vault - -----------7+-7---- $500 For proper underground electrical distribution a new transformer vault is needed. 6. Tunnel from Power Plant to Hixon Laboratory ~ - ~ - $1,600 Distilled water and chemical supplies for the hospital operating and treatment rooms will be transported from the Hixon Laboratory through tunnels connecting all buildings. The only tunnel not already constructed is that one proposed above. -~ 12 ~