UNIVERSITY OF KANSAS SCHOOL OF ENGINEERING AND ARCHITECTURE LAWRENCE OFFICE OF THE DEAN October 26, 1938 Dr. F. C. Allen Department of Physical Education Robinson Gymasium Campus Dear Dr. Allen: You may desire a report on the money spent and work done on the grading of the intramural field. Following is a brief report. For grading of field: Hire of power shovel - - - -—- $ 486.20 Hire of trucks - - - - — = 338.890 Extra driver for truck - - - 11.20 Labor paid for grading - - <- 90.65 Engineering and supervision - 94.90 Total for grading - §$ 1020.85 There was moved a total of 9050 cubic yards, which gives a unit cost for moving the earth and planing it down of 11.3 cents per cubic yard. This does not give credit for the W.P.A. labor received, which was used in leveling earth dumped from trucks during the last half of the work. As shown above, we spent $90.65 for this labor before W.P.A. help was assigned. In reality we have accomplished a great deal more than I had ever hoped for the money we had to spend, as the best contract bid we had on the grading was 20 cents per cubic yard. We were very fortunate in being able to get the Towmmship power shovel at $2.50 per hour rental, as such a shovel usually rents for about $4.00 per hour. In addition to the above expense, there are outstanding bills for the following: 120 Steel Guard Posts (Coens) at «40 — cK = ied — = = $ 48.00 28 sacks cement (Friends) at .70 less 108 - - - -+ 16.80 Sand, approximately - - - - 5.00 Paint and brushes (Green Bros.) 4.93 — Total - - - - - § 74.73 I believe you mentioned you had purchased about $60.00 worth of pipe for bringing water to the field. On the above basis then, there has been spents $ 1020.85 74.73 60.00 $ 1155.58