Noe Noe Noe Noe Noe Noe 1 hole 2 hole 3 hole 4 hole 5 hole 6 hole Reconstruction of Golf Vourse Necessary improvements ~ filling in of ditch in front of green, possibly 20 loads of soil, and seeding on top so that all may be mowed out through the greene Level the paths in Noe 1 fairway and build large 50 foot tees; sand and oil on the green once a year; removal of one tree, if possiblee Estimates e « e $120200 Seeding around greens and tile drainage under greens since it is built under a bank; sand and oil; re- moval of one tree if possiblee Estimate . « « « « 6000 Leveling of ridge between tee and green; tile drain- age in the swamp and bunkers around greens; level- ing of fairways and seed. Estimate eeece ce ee 75-200 Both trees need removing in middle of fairwey; drain-e age tile above green just below old log cabin; sand and oil and new base construction; fairway seed. Estimate ee «ee ee ec ee ee © © & © © @ 40.00 New fairway topping for whole distance; filling in of swamp and road across fairimy; 30 loads of soil and possibly all new seeded fairway; green base of clay and oil and sand and oil tope « e ee «+ « ¢ 010200 Good shapee Oil and sand on the green; 20 fte tee and leveling fairwey onlye Estimate ee «+e 15200 Total estimate of reconstruction of course e « « 0 « + ee + 6 © © $410200 Rest would be labor snd maintenance costs only 1400.00 | $1610.00 I sincerely believe that this six-hole golf course can be maintained in first class condition for $1500.00 a year provided student labor is furnished by CSEP. If 3 more holes are added the maintenance should not be more than $200.00 a year after they are built. require some moving of trees and extre labore It is my belief that this course could be supervised by expert hands and kept in first class condition with the above approved budgete Sincerely, Glenn Oatmean Golf Coache Building three extre holes would be optional and